Books › In Perpetuity
In Perpetuity ยท a novel

Chapter EightThe Parent's Letter

Chapter 8 of 183 min read640 words

BOARD MINUTE โ€” THORNMERE ENERGY LTD, 18 NOVEMBER 2032 (extract) "The Board noted that the Thornmere Riverside scheme has recorded an operating loss in each year since 2022, totalling ยฃ5.9m, and that the shortfall is funded by intercompany loan from the Parent. The Board noted the Parent's letter of 2 November 2032 confirming that support will not be extended beyond 31 March 2034, and that from that date the scheme must be self-funding, restructured, or placed into an insolvency process. The Board instructed management to model a cost-recovering tariff and to report on the consequences of applying it."

A cost-recovering tariff is three thousand one hundred and twenty-six pounds. I have been instructed to model the consequences of applying it. I know the consequences. I have modelled them four times.

โ–

Why the parent funded it for a decade and has stopped

Because it was always meant to be temporary.

In 2022 the loss was a timing problem: phases three and four were coming, the connections would arrive, and the scheme would come right by 2029. Funding a loss across a build-out is ordinary infrastructure behaviour and the parent did it without complaint.

By 2026 it was clear phase four was gone. By 2027 the consent had lapsed. From then on the funding was no longer a bridge to anything; it was a subsidy of a fixed annual amount, forever, to four hundred and twelve households, from the shareholders of a company that owes those households nothing beyond a heat supply contract.

No commercial board can carry that indefinitely and none should be expected to. I have sat in the room. The directors are not monsters; two of them have asked me, in private, what I think should be done, and I have not had an answer for them.

โ–

The four models

Cost recovery. Standing charge ยฃ3,126. My estimate is arrears on a hundred and sixty of the four hundred and twelve within a year, forced sales, a county court judgment list, and a story in a national newspaper that would be completely fair.

Partial recovery. ยฃ1,900, phased over three years. Reduces the loss to about four hundred thousand pounds. Still unaffordable for a significant minority and still a loss the parent has said it will not fund.

Restructure the debt. The most promising and the least in my control. A twenty-five-year loan refinanced over forty at a lower margin takes perhaps two hundred thousand pounds a year out of the fixed cost. It requires a lender to accept a scheme at twenty-nine per cent load, which three have now declined.

Insolvency. The network is a going concern asset; an administrator sells it; a buyer pays little for it and charges cost recovery, because a buyer has no parent and no reputation to protect. Insolvency does not reduce the charge. It removes the only party currently absorbing any of it.

โ–

The thing I have not been able to write in any of those four reports

That the shortfall is a consequence of a planning condition imposed in the public interest, correctly, to secure a public benefit โ€” a thirty-seven per cent carbon reduction โ€” on the assumption of a development that the planning system then did not deliver.

The carbon benefit was banked in 2019 against the whole scheme. It was real for phases one and two and notional for the rest. The public got the policy outcome it required at the point of consent, and the cost of the unbuilt two thirds is being met by private residents and private shareholders, with no mechanism by which anybody can even consider whether that is the right place for it to sit.

I have written that paragraph four times and deleted it four times, because it is not a recommendation and my reports are supposed to contain recommendations.

All 18 chapters · In Perpetuity

Use the ← and → arrow keys to turn the page. Your place is kept in this browser.