CARROW POINT, SALTGATE โ BUILDING SUMMARY Completed March 2008. Developer: Marrowdene Homes (North) Ltd โ dissolved 2011. Main contractor: Hesketh Vallance Construction Ltd โ administration 2009, dissolved 2012. Building control: approved inspector (private). Firm acquired 2014; records transferred; partial file only. 14 storeys. 96 flats. Single stair, single escape, dry riser. No sprinklers (not required at the time for this height). Tenure: 96 leasehold (125-year leases from 2008). Freeholder: an investment company holding the ground rents. Management: Carrow Point Management Company Ltd, directors elected from among the leaseholders. Reserve fund at 31 March 2032: ยฃ41,200. Annual service charge: ยฃ3,900 per flat.
Two dissolved companies, a part-file from an acquired approved inspector, and ninety-six households who own a lease and a problem.
What Carrow Point is like
An ordinary good building. Brick-coloured render, balconies, a landscaped forecourt with bike stands, a lobby with a sofa nobody sits on.
It was built for people buying their first or second flat and that is who lives in it: nurses, teachers, a lot of people in their thirties, some retired couples who downsized, four flats owned by the same local landlord.
Nothing about it is a scandal. It is not a tower of social housing with a known cladding problem and a campaign behind it. It is a mid-market block in a northern town, and its external wall is a render system over expanded polystyrene, which was a completely standard, compliant, well-regarded way of building in 2008 and which is now a question.
Why the insulation matters
Expanded polystyrene is combustible. That is not a revelation and it was not hidden; it was used on hundreds of thousands of buildings, in systems that were tested and certificated as assemblies.
The question is never the material on its own. It is the system: the insulation, the render, the thickness, the fixings, and above all the cavity barriers โ the fire-stopping at each floor level and around openings that stops a fire travelling in the gap behind the finish.
A render-on-insulation wall with correct cavity barriers, correct detailing at the balconies, and the right products is a perfectly satisfactory wall. The same materials without barriers at the floor lines is a different building.
The materials at Carrow Point are ordinary. The question is whether the barriers are there, and there is no document in the world that answers it.
The balconies
Timber-framed, with timber decking and a timber soffit, cantilevered from the slab and penetrating the render.
In 2008 that was common and compliant. It is also, in every assessment guidance published since, the detail that gets looked at hardest: a combustible balcony is a vertical route for fire from one flat's open door to the one above, and where the balcony frame penetrates the insulated wall you have a junction that must be fire-stopped.
I have looked at four of them from inside the flats. I have not been able to see a single junction, because seeing a junction means removing a soffit.
The management company
Five directors, all leaseholders, unpaid, elected at an annual meeting that about twenty people attend.
The chair is a retired primary school head called Bernadette Quill. She has read my report four times, she has read the government guidance, and she understands the difference between unable to confirm and unsafe better than two of the three valuers I have spoken to.
She is also the person who has to decide whether to ask ninety-six households for one thousand nine hundred and thirty-eight pounds each, and she is sixty-nine, and this is her retirement.