
Uncertainty can be carried by a description and cannot be carried by a decision - so at the first point where somebody has to act, the absence of a finding becomes an adverse one.
A chartered fire engineer assesses a 14-storey block of 96 flats built in 2008: render on expanded polystyrene, timber balconies, no as-built drawings, no product data, a part-file from an approved inspector whose firm was sold, and a developer and contractor both dissolved. Her client funds a visual inspection and two intrusive openings. At both, the construction is ordinary and competently installed, and there is no cavity barrier. Two openings on four elevations, fourteen floors and ninety-six balcony junctions cannot tell her whether that is a local defect or a systemic absence - and the remediation implications differ by a factor of more than fifty.
So she writes UNABLE TO CONFIRM, with the specification and price of a conclusive investigation on page two in bold: 22 openings, laboratory identification, GBP 186,000. Her fee is GBP 1,400. Her professional indemnity policy has excluded external wall fire safety advice since 2020, no insurer will write it, and her opinion is litigable for thirty years against a standard that has been reinterpreted four times in five years. A colleague who signed a building adequate in 2022 is an uninsured defendant in a GBP 4.1m claim listed for 2036.
Lender criteria put 'does not confirm that the standard is met' in the same box as 'no assessment exists'. Four years of work, a GBP 6,800 investigation and a 26-page report leave the building exactly where it would be if nobody had looked. Nine valuers ask whether it is safe; one asks what evidence is missing. Fourteen sales abort. A theatre nurse of 37 declines a job in Leeds, cannot get consent to let, and becomes a captive customer of one bank - and reads the report three times before arriving at the question nobody is arranged to answer.
Her practice's own audit: 212 reviews, 80 unable to confirm, 23 later investigated in full - and 17 of those 23 were adequate. Seventy-four per cent of the buildings she could not confirm were fine, after a median of three years and four months unsellable. She asks for a third outcome with a name, gate conditions, an evidence field on all three outcomes, and investigation funding attached to it instead of to established remediation. She refuses a lower evidential standard, assessor immunity, and compelling lenders to lend - and states the honest worst case: two of those 23 needed urgent work, and it was the market's undiscriminating harshness that got them looked at. A work of fiction: the town, the building, the practices and every person in them are invented.
12,105 of 12,233 words ยท 99%
ยฉ 2026 Lazarus Jackson. All rights reserved. This is a work of fiction. All characters, companies, institutions and events are invented; any resemblance to real people or organisations is coincidental.