Books › Unable to Confirm
Unable to Confirm ยท a novel

Chapter FourNot Held

Chapter 4 of 183 min read654 words

DOCUMENT REQUEST โ€” CARROW POINT. OUTCOME (I. HALSALL, 2032) As-built drawings of the external wall: not held. Developer and contractor both dissolved. Managing agent holds sales brochures and an O&M manual for the lifts. Approved inspector's file: partial. Final certificate present. No external wall construction details; no cavity barrier drawings; no product certificates. Successor firm confirms the file is as transferred in 2014. Product data for the render system: not identified. The render is a proprietary thin-coat system; at least four manufacturers supplied visually indistinguishable systems in the region in 2007โ€“08. Insulation: 90 mm EPS observed at 2 locations. Manufacturer unknown. Fire performance classification unknown. NHBC/warranty file: expired 2018; no technical documentation retained. Conclusion: the construction of this wall cannot be established from documents. It can only be established by opening it.

Six requests, six answers of not held, and a final certificate confirming that in 2008 somebody was satisfied.

โ–

Why the documents are gone

Nothing sinister. Two companies failed in a recession, a private building control firm was bought and its files were transferred with the gaps that transfers have, a warranty expired after ten years, and nobody at any point had a duty to keep a record of what was in a wall for the life of the building.

There was no such duty in 2008. There is one now โ€” the golden thread of information, which is one of the genuinely good things to come out of the last decade โ€” and it applies going forward, to buildings being built and altered.

For the two to three hundred thousand mid-rise buildings put up between about 1995 and 2018, the information does not exist and cannot be created except by cutting into them.

โ–

The four manufacturers

This is the detail that explains more than anything else why the answer costs a hundred and eighty-six thousand pounds.

A thin-coat render over insulation looks, from a cradle or from the ground, identical whoever made it. The systems differ in mesh, basecoat thickness, adhesive, fixing pattern and the fire classification of the assembly, and those differences decide whether a wall is adequate.

You cannot tell by looking. You cannot tell from a photograph. You determine it by taking a physical sample and having a laboratory identify it, and you need samples from more than one elevation because buildings of this age were frequently finished by more than one subcontractor using whatever was on site.

โ–

The final certificate

The approved inspector's final certificate is in the file. It confirms that the building was, in the inspector's opinion, compliant with the building regulations in 2008.

That document is the reason Carrow Point was sold, mortgaged and insured for twelve years without anybody asking a question, and it is worth nothing to me.

Not because the inspector was negligent โ€” I have no reason to think so, and plenty of buildings certified then were built exactly as designed. It is worth nothing because it records a conclusion and not the evidence for it, and because the standard it certifies against has been reinterpreted since, and because I cannot assess a wall against somebody else's unrecorded satisfaction.

โ–

What Bernadette Quill said when I explained this

She listened to the whole of it and then asked the only question that matters.

She said: "So the building hasn't changed. The building is exactly what it was in 2019 when we could all sell our flats. What's changed is that somebody asked."

That is exactly right and I have never found a satisfactory thing to say to it. The wall at Carrow Point is the same assembly of render, polystyrene, brick and timber it has been since March 2008. What changed in 2020 is that lenders began requiring an opinion, and an opinion requires evidence, and the evidence was never kept.

The building did not become uncertain. It was always uncertain. We only started measuring.

All 18 chapters · Unable to Confirm

Use the ← and → arrow keys to turn the page. Your place is kept in this browser.