WHAT I AM ASKING FOR That the external wall assessment regime define a third outcome with a name, a meaning and an instruction attached to it: "EVIDENCE INCOMPLETE โ NO EVIDENCE OF INADEQUACY IDENTIFIED." To be recorded only where the assessor has carried out intrusive investigation, has identified no evidence of inadequacy beyond defects capable of local repair, and states what evidence is missing and what obtaining it would cost. Three consequences: 1. Valuation and lending guidance to treat it as a defined, priceable category โ not as equivalent to "remediation required", and not as equivalent to "no assessment carried out". 2. The outcome field to record the evidence base โ number of openings, product identification yes or no โ for all three outcomes, including "meets the standard". 3. Eligibility for investigation funding to attach to this outcome, rather than requiring remediation to be established first.
A name, a definition, and a field recording how many holes were made. That is the whole of it.
Why the name matters more than it should
Because unable to confirm describes my state of mind and the new wording describes the building.
They are the same finding. Unable to confirm is heard as the engineer would not sign it off, which carries an implication about the building that the words do not contain. Evidence incomplete โ no evidence of inadequacy identified says, in order: we looked, we found nothing wrong, and we have not looked at all of it.
That is what my report says on page nine. I am asking for it to be the outcome field rather than page nine.
Why the gate conditions are strict
Because a third category that is easier to reach than meets the standard would simply become the new default, and every Report B would use it, and it would mean nothing within a year.
So: intrusive investigation must have been carried out. A visual inspection cannot reach this outcome. No evidence of inadequacy beyond locally repairable defects. And the missing evidence and its cost must be stated โ which means an assessor reaching for this status has to commit, in writing, to a specification and a price that can be checked against the market.
Report B could not have used it. It had no openings. Under my proposal, a visual-only assessment has exactly two available outcomes: remediation required, or no assessment of the construction has been carried out โ which is the truth about it.
Why the evidence field applies to all three outcomes
This is the part I care about most and the part nobody asks me about.
At present meets the standard reached on twenty-two openings and laboratory identification is indistinguishable from meets the standard reached on binoculars. A lender cannot tell. A purchaser cannot tell. A leaseholder in the building certified by Report B does not know what their certificate rests on, and will not know until a reassessment in 2039.
Recording the evidence base โ three numbers and a yes or no โ makes a favourable outcome legible too. It costs nothing, it is information every assessor already has, and it is the only thing in my proposal that protects people from engineers rather than from the market.
Why the funding gate must move
Chapter Ten is the whole argument. Public funding and developer schemes require an established need for remediation; establishing it costs a hundred and eighty-six thousand pounds; and the leaseholders who cannot afford the investigation are therefore permanently ineligible for the money that exists.
The gate is in the wrong place by one step. Attach eligibility to evidence incomplete and the four thousand one hundred and eighty flats in my files have a route.
Why I think it is small
It defines a category that the assessment guidance already permits. It adds four data fields to a form. It asks valuation and lending guidance to distinguish between two things that are already different.
It requires no new standard, no change to liability, no relaxation of evidence, and no new money except the investigation funding โ which already exists and is already spent, later, on worse outcomes.
And the industry has done it before, five or six times, for five or six other risks.