Books › Unable to Confirm
Unable to Confirm ยท a novel

Chapter SixteenWhat It Would Not Do

Chapter 16 of 183 min read785 words

WHAT THIS WOULD NOT DO It would not tell anybody what is in the wall at Carrow Point. Only 22 openings do that. It would not reduce the ยฃ186,000, the ยฃ7.8m, or the ยฃ81,250 a flat if remediation is needed. It would not restore the lost records, re-create the dissolved companies, or extend a warranty that expired in 2018. It would not have let Tomasz Wierzbicki take the Leeds job in February 2032 โ€” a priceable category is not a mortgage. It would not change the liability, the insurance exclusion, or the fact that I sign in my own name. Most likely effect: Carrow Point's investigation gets funded in 2034 instead of never, and the building is either cleared or remediated by about 2036.

Everything hard about this building stays hard. The wall is the wall and somebody still has to cut twenty-two holes in it.

โ–

The honest counterfactual for Carrow Point

A defined third status does not value a flat. It lets a valuer price a range instead of recording nil, and whether any lender actually lends against it depends on whether the range is narrow enough, and at Carrow Point the range is nothing to seven point eight million pounds, which nobody can price.

So for Carrow Point, the status by itself changes nothing. What changes it is the third limb โ€” funding eligibility attaching to evidence incomplete rather than to established remediation โ€” because that is what gets the twenty-two openings done.

And then the building is either cleared, in which case ninety-six households get their lives back, or it needs work, in which case they have a liability they can at last apply for help with. Both of those are better than the fourth year of not knowing.

โ–

What it does not fix

The fundamental problem, which is that nobody kept a record of what was in two or three hundred thousand buildings. No category, name or form addresses that, and the only remedies are to open the walls or to wait forty years for the stock to be replaced.

Deryn Masefield's case. She signed adequate in 2022 under the guidance of the day, and a third status would not have helped her, because she believed she could confirm it. She is still a defendant and still uninsured.

And it does nothing about the thing in Chapter Thirteen, except make it visible: Report B's practice will go on reaching favourable outcomes on thin evidence, and my proposal does not stop them. It only means that a lender can see that the favourable outcome rests on a visual inspection, and can decide what to do about that. Visibility is not prohibition.

โ–

What it does fix

One thing: it stops the absence of a finding being read as an adverse finding.

That is the entire content of this book. A chartered engineer examined a building, opened it up, found ordinary competent construction and two locally absent barriers, reported that the remediation implications range over a factor of fifty, and recommended a specified investigation at a stated price โ€” and the output of all of that was indistinguishable, in every document downstream, from a building nobody had looked at.

Four years of ninety-six households' lives turn on the fact that there are two boxes.

โ–

The honest worst case, and it is a serious one

The third status becomes a hiding place.

It is designed with gate conditions โ€” intrusive investigation required, no evidence of inadequacy beyond locally repairable defects, missing evidence and cost stated โ€” and those conditions are the whole of my protection, and they are conditions applied by assessors.

Two of the twenty-three buildings in Chapter Eleven turned out to need urgent work. In both, I had written unable to confirm, and in both the market's harsh, undiscriminating response โ€” nil value, no sales, pressure on the freeholder โ€” is part of what got the full investigation funded within months rather than years.

If those two buildings had carried a status that lenders treated as priceable, the pressure would have come off, and the investigation might have taken three years instead of three months, and there would have been two buildings with absent barriers across two elevations and no interim measures, occupied, for three more years.

I have thought about that harder than anything else in this proposal. My answer is the gate conditions and the evidence field, and it is not a complete answer. The present system protects those two buildings by freezing four thousand one hundred and eighty flats, and I think that is the wrong trade, and I accept that I am arguing for a trade and not for a free improvement.

All 18 chapters · Unable to Confirm

Use the ← and → arrow keys to turn the page. Your place is kept in this browser.